The American School in London, St John’s Wood

Client: The American School in London

Project Value: £500k +

Duration: 1 year

Main Contractor: ISG

Architect/Designer: Orms Architecture Design (pool); Walters & Cohen (art building)

The American School in London is a private, co-educational school for children and young people aged between 4 and 18. EPC worked on two new buildings for this complex project: a swimming pool and an arts building.

We completed the following work for this ISG-led scheme:

  • Main Pool Building (1500m2 of tiling works)
    • Screed & UFH to all floor areas
    • Render & tanking to swimming pool tank (all designed and specified by EPC)
    • Floor & wall tiling to swimming pool tank
    • Floor tiling to swimming pool surround & seating area
    • Floor & wall Tiling to interior changing room / showers
    • Glass mosaics to exterior changing room feature wall
  • Arts Building (200m2 of tiling works)
    • Screed & UFH to all floor areas
    • Floor & wall tiling to male/female WCs
    • Wall tiling to cleaning areas within classrooms

Further information (pool): https://www.asl.org/facilities-and-services/aquatic-fitness

Further information (arts building): https://www.archdaily.com/799986/arts-building-for-the-american-school-in-london-walters-and-cohen-architects